PEB Steel Warehouse & Industrial Shed Calculator

Portal Frame Steel Weight (MT), Z-Purlins, Roofing Cladding Sheets, Pedestal Footing & Turnkey Budget

PEB Floor Footprint
960 m²
10,333 sq ft (9 Portal Frames)
Primary Frame Steel (Cols+Rafter)
21.1 MT
22.0 kg/m² (2.04 kg/sq ft)
Secondary Steel (Purlin+Bracing)
11.5 MT
12.0 kg/m² (Z-Purlin + Girts)
Total Structural PEB Steel
32.6 MT
34.0 kg/m² (6.96 lb/sq ft)

Clear-Span PEB Portal Frame Cross-Section Schematic (IS 800 / AISC)

Roof PPGI Sheet Area (+8% lap)
1,042 m²
Ridge Height: 8.5 m · Gutter: 96 Rmt
Wall Cladding Sheet Area
714 m²
Above dado wall + both gables
VDF Trimix Floor Concrete
144 m³
+ Pedestals & Footings: 45 m³
Self-Drilling Screws + Bolts
7,024 Nos
Anchor Bolts: 72 Nos (M24)
PEB Superstructure Cost
-
Steel + Sheeting + Gutters
Civil Foundation + VDF Floor
-
Footings, Dado Wall & Flooring
Total Turnkey Shed Budget
-
-
PEB & Civil Component Quantity Unit Est. Budget

How to Use Our PEB Steel Building Weight & Warehouse Cost Calculator (2026)

Pre-Engineered Steel Buildings (PEB) dominate modern factories, logistics godowns, cold storages, and workshops across India and the United States. Our free peb steel building weight calculator gives industrial contractors and civil engineers instant preliminary estimates for primary portal frames, secondary Z/C purlins, PPGI roofing/wall cladding sheets, VDF concrete flooring, anchor bolts, and turnkey budgets.

Key Engineering Outputs

  1. Primary & Secondary Steel Weight (Tab 1): Scales structural steel unit consumption (kg/m² and lb/sq ft) dynamically based on clear span width (8–60 m), eave height, design wind zone (39–50 m/s), and EOT overhead crane loads (0 / 5T / 10T).
  2. Roofing Cladding & Civil Works (Tab 2): Calculates 0.5mm PPGI trapezoidal roof sheets (+8% overlap), wall cladding above dado brickwork, VDF Trimix concrete flooring, column footings, M24 anchor bolts, and self-drilling fasteners.
  3. Complete Turnkey Shed BOQ (Tab 3): Generates an itemized steel + civil budget in INR (₹) or USD ($) with printable PDF and CSV download.

Typical PEB Steel Consumption Benchmarks (2026 Thumb Rules)

Clear Span Range EOT Crane? Typical PEB Steel Weight (kg/m²) Equivalent (lb/sq ft)
12 – 18 m Small Shed No Crane 26 – 32 kg/m² 5.3 – 6.6 psf
20 – 30 m Warehouse No Crane 32 – 39 kg/m² 6.6 – 8.0 psf
20 – 30 m Factory 5T – 10T EOT Crane 42 – 55 kg/m² 8.6 – 11.3 psf

Related Structural & Roofing Calculators

Frequently Asked Questions (FAQs)

How much steel is required per sq ft or m² for a PEB warehouse?

A standard clear-span PEB warehouse (20 m wide, 7.5 m eave height, no crane) typically uses 32 to 38 kg of structural steel per m² (~3.0 to 3.5 kg per sq ft), split roughly 62% primary tapered frames and 38% Z-purlins, girts, and bracing.

What concrete slab thickness is standard for industrial Trimix VDF warehouse flooring?

Light-to-medium forklift logistics warehouses typically specify 150 mm (6 inches) M25/M30 VDF Trimix concrete over a 150 mm compacted GSB sub-base, increasing to 200 mm under heavy racking.